Hi all,

I am new to this forum and to Maple, I would appreciate some help. As you can read from this post

http://www.mapleprimes.com/forum/integralslongsumsandkernelconnectionlost

I am trying to evaluate an integral of a long sums of functions. In that post (still unanswered) I report a kernel connection lost. I have now raised the datalimit to my physical limit, so that the "kernel connection lost" error has disappeared (for now). The real problem is that I need to increase the order of my Fourier Series up to eight terms or more.

Questions:

  1. I am running on Maple 11.0 on Mac OS X. Is the task I have described above suitable for multithreading? Would Maple 12 help me speeding up my computation time (I have eight cores)
  2. Do you have any suggestions as to how to optimise the script uploaded in the above link?

Thank you very much for your help.

Daniele


Please Wait...